top of page

PROJECTS

Zeerust PV Plant 75 MWac

Scope

  1. Construction of the RE Capital 2- Substation Control Building

Location

Client

Zeerust/ North West

IstoGuard

Status

Complete -Dec 2020

De Wildt PV Plant 50 MWac

Scope

  1. Design/ Construct & Furnish the O&M Building

Location

Client

Brits / North West

IngweGuard

Status

Complete -Dec 2020

Unin 88 kV Distribution Sub. Phase 2

Scope

1.      Platform construction.

2.      Equipment foundations

3.      Structural steel supply/ assemble & install

4.      Primary plant equipment installation including stringing

5.      Kerbing

6.      Procure, supply and install yard stone

Location

Client

Limpopo

Eskom

Status

Complete

Spudshaft 132 KV Distribution Sub.

Scope

  1. Refurbish Transformer 6a,6b and 6c bays by constructing 1 x 20MVA 88/6.6kV Transformer bays consist.

  2. Refurbish 1 x 88kV line bay and constructing 1 x 88kV line bay.

  3. Extend the Earth mat from the newly extended substation side.

  4. Install 1 x Transformer bund wall

  5. Replace existing fence with new palisade fence.

  6. Rotate 1 x 10.5m existing beam by 180° or Construct 1 x 10.5m new beam

  7. Construct 6.6kV Twin Bull Busbar (stringing only)

  8. Construct 2 x 88kV Bull Busbar (stringing only)

  9. Replace 54 x 88KV Long rods including Clamps

  10. Install 1x lightning mast

  11. Dismantle all primary plant equipment/ cabling and foundations.

  12. Procure, supply and install yard stone.

Location

Client

Limpopo

Eskom

Status

Current

Adamskraal 33/132kV Distribution Sub. - Perdekraal Windfarm IPP under (EPC) Contractor

Scope

  1. Steel Assembly and Erection.

  2. All Secondary Works Including:

  3. Earthing of Structural Steel Work and Primary Plant Equipment.

  4. Stringing & Clamps.

  5. Control & Protection Cabling.

Location

Client

Western Cape

Consolidated Power Projects (CONCO)

Status

Complete

Zeus 400kV Transmission Sub. Feeder 6 and 7

Scope

  1. All Secondary Works Including:

  2. Stringing Bull Conductor.

  3. Control and Protection Cabling.

  4. Control Panels Installation & Wiring.

Location

Client

Mpumalanga

ERI - Member of Eskom

Status

Complete

Gopane 132 kV Distribution Sub.

Scope

Bulk Earthworks, Earth Grid, Equipment Foundations, Complete Control Room, Steel Assembly and Erection, Install Primary Plant Equipment, Stringing, Control and Protection Cables, Labelling

Location

Client

Limpopo

Eksom

Status

Complete

Zwartkloof 88kV Distribution Sub.

Scope

  1. Construct 66kV busbar Isolator, 66kV transformer breaker, 3x 66kV current transformers and install new 1x 10MVA 66/22kV transformer on the reserved space.

  2. Extend the existing 66KV beam and normalize the existing 1x10MVA 66/22kV transformer.

  3. Construct fire wall between the transformers.

  4. Construct 22kV kiosk breakers for the MV transformers protection.

  5. Normalize existing vertical busbar by constructing box type busbar structure.

  6. Construct a beam to connect MV side of the transformer to its MV bays.

  7. Replace 2x Existing Reclosers by 2 x Kiosk Breakers, 2x Existing Feeder Isolators by 2 x New Knife link Isolators, 1x Existing Transformer 1 22kV Kiosk Breaker by 1 x New Kiosk Breaker.

  8. Construct new 22kV feeder bay for new Nqobi feeder.

Location

Client

Bela Bela

Eksom

Status

Complete

bottom of page